United Kingdom · Calculators

Share site power between EVs

Allocate limited site power to named vehicles by priority and departure, and show unmet needs.

United Kingdom · Choose an edition

User-supplied scenario

Files stay in this browser. No upload.

Parameters

Inputs

Elapsed hours from day 1 at midnight: 22 = 22:00, 31 = day 2 at 07:00. Use actual elapsed durations across clock changes. Intervals include their start and exclude their end. Power is the interval average. Decimal dot or comma; no thousands separators.

CSV headers below are fixed identifiers. Comma, semicolon or tab; quoted cells supported. Import replaces this table only. Maximum 1 MB.

Profile

start_h (h), end_h (h), site_kw (kW), base_kw (kW)

Vehicles

name, arrival_h (h), departure_h (h), need_kwh (kWh), charger_kw (kW), priority

Enter your measurements or import a CSV to calculate.

Calculation method

Allocate limited site power to named vehicles by priority and departure, and show unmet needs.

For the installation context behind these inputs, read Home EV charger installation UK requirements.

Continue the calculation with Solar surplus EV charging, Overnight EV charging schedule, Measured peak demand analyzer.

Method and assumptions

Sources

All electricity tools