United Kingdom · Calculators

Equipotential bonding map

Name parts and their connection targets to draw the observed bonding network.

United Kingdom · Choose an edition

Kept in this page only. Save JSON before leaving; nothing is uploaded.

My record

No rows yet. Add an item or load the labelled example.

Equipotential bonding map
Item / identifierLocation / roomPart / materialConnected toConnection observationRecorded conductor section (mm²)Measured resistance (Ω)Access / clamp locationNotesRemove
Rows
0

Up to 100 rows. JSON/CSV: 4 MB. CSV contains no photos; use JSON to keep them.

A record of supplied observations, not an approved inspection or certificate. No automatic compliance decision or test procedure.

Connections follow your explicit targets. Dashed lines mean unknown or unobserved connections. This is not a wiring plan or a continuity result.

Calculation method

Name parts and their connection targets to draw the observed bonding network.

For the installation context behind these inputs, read Earthing system types: TN-S, TN-C-S and TT.

Continue the calculation with Protective conductor continuity record, Earthing measurement report.

Method and assumptions

Sources

All electricity tools