United Kingdom · Calculators
UPS capacity calculator in watts and VA
Compare UPS watts, VA and battery energy with continuous load, startup peak and target duration. Enter power factors, conversion loss and rating reserve.
United Kingdom · Choose an edition
Calculation method
Reserve is the unused share of final rating, not a load markup. Supply both W and VA ratings. Battery energy is usable before conversion at the intended load.
Continue the calculation with Battery backup runtime calculator, Generator fuel runtime calculator, Inverter starting load check.
Method and assumptions
- Energy is an estimate; verify runtime with the exact UPS curve. Peak duration, waveform, transfer time and compatibility are not validated. VA does not represent battery energy.