Backup load priority planner
Rank essential loads, include a scenario and compare running and simultaneous starting power with entered limits.
United Kingdom · Choose an edition
Starting power is the total power during starting, not an increment. Load energy excludes inverter losses and battery reserve.
Your entries stay in this browser. Save the project before leaving.
Scope and limits
Planning only: no connection instructions, battery autonomy, transfer-switch validation or medical continuity guarantee. Source duration and VA limits require separate review.
Reference links identify the local framework. No clause or compliance decision is automated.
Local primary references
- IET — BS 7671 edition checker · Sources opened 2026-11-18
Calculation method
Starting power is the total power during starting, not an increment. Load energy excludes inverter losses and battery reserve.
Continue the calculation with Multi-day power outage simulator, Inverter starting load check.
Method and assumptions
- Planning only: no connection instructions, battery autonomy, transfer-switch validation or medical continuity guarantee. Source duration and VA limits require separate review.